Notice: wpdb::prepare was called incorrectly. The query does not contain the correct number of placeholders (2) for the number of arguments passed (3). Please see Debugging in WordPress for more information. (This message was added in version 4.8.3.) in /var/www/vhosts/tubacero.es/httpdocs/wp-includes/functions.php on line 4145
Blasting | Tubacero

Test Bench l Blasting l Primers and surface treatments l Cutting of pipe Pressure Tests for valves


Automatic tunnel for metallic blast to surface treatments of pipes and fittings with cleaning degrees SA1 to SA21/2 and required rugosity to the application of paint.

One cubicle of 15M x 6M for manual blasting with metallic blast to pipes and structures of big dimensions.